Data Center Commissioning
UPS strings, generators and switchgear have to be proven at full load, at Level 4/5 integrated system testing, before IT load arrives.
Configuration
Container-type or multiple air-cooled units for the generator and utility side, plus rack-mount loads (air-cooled 10–22kW, liquid-cooled 10–40kW, 3U–6U) inside the white space for per-rack and per-PDU verification. Units daisy-chain under one control point so a whole step profile runs from a single operator station.