About Us

Built in the Factory, Proven in the Field

3M Load Bank designs and manufactures resistive test loads for teams who have to prove that a power system holds up under real load — not on paper. We build the load elements, cabinets, cooling packages and control systems ourselves, which is why we can quote a non-standard voltage, an unusual step pattern or a space-constrained cabinet without redesigning around a catalogue.

Our equipment is used for UPS and generator acceptance testing in data centers, shipboard and shore-supply commissioning in shipyards and naval programs, inverter and energy-storage validation on new-energy sites, ground-power and avionics testing in aerospace facilities, and factory acceptance testing at generator manufacturers.

Most projects start as a specification conversation: rated power, voltage and frequency, step resolution, power factor, control protocol, ambient conditions and how the unit has to be moved on site. From there we scope a configuration, confirm cooling and exhaust requirements, and manufacture to that specification.

Power range
1 – 2000 kW
Container capacity
up to 6000 kVA
Voltage range
0 – 10.5 kV AC/DC
Temperature drift
≤ 1%

How We Work

In-house Resistor Manufacturing

Load elements are wound, coated and burn-in tested on our own lines, so element tolerance, temperature drift and derating behaviour are controlled rather than sourced.

Full Power Range, 1kW to 2000kW

Air-cooled, liquid-cooled (3M8000 series), air-liquid hybrid, container-type, rack-mount and portable formats — built to the voltage, frequency and step resolution the test program needs.

Test Before Ship

Every unit is run at rated load before crating: step accuracy, power factor behaviour, exhaust temperature, noise level, control protocol and metering are recorded on a test report that ships with the equipment.

Engineer-to-Engineer Support

Enquiries reach a manufacturing engineer, not a reseller. Single-line diagrams, cable sizing, cooling loop requirements and Modbus integration are scoped directly with your commissioning team.

Talk to a Manufacturing Engineer
Load bank cabinets running under full load in the factory test area
Load bank assembly line inside the factoryEngineer inspecting a control cabinet during final QCCrated load banks ready for export shipment

04 / Factory & Credentials

A Factory BehindEvery Test Report

We design, build and test resistive load banks in-house — so the engineer answering your technical questions is the same team that welds the frames and signs off the test data.

Certified Manufacturing
ISO 9001 quality management with CE-conformant electrical design; certificates available on request for tender documentation.
100% Factory Testing
Every unit runs a full-load burn-in and metering verification before dispatch, delivered with its own test report.
Built to Your Spec
Custom power ranges, voltages, frequencies, cooling architecture, control protocols and enclosure ratings.
Export-ready Delivery
Typical 4–8 week lead time, export-grade crating, and remote commissioning support wherever the units land.

Our client listing includes

  • Power Generation Group
  • National Shipyard
  • Hyperscale Data Center
  • Energy Storage Systems
  • Aero Systems Lab
  • Marine Engineering Co.

Placeholder listing — send us your approved client logos and we will publish them here.

Tell us your test profile

Send your power range, voltage, frequency and site conditions — our manufacturer engineer replies with a configuration proposal and full technical specification.